Calculating potential savings
Projects will vary from company to company. Our sample
calculation for rebates is based on the scenario below:
Company X's existing equipment operates 8 hours per day,
250 days per year, and consumes 55 gallons per minute (gpm). Company X proposes to replace this piece of equipment
with a similar one that operates on the same schedule, but consumes
only 30 gpm. The estimated project cost is $80,000.
Applying the Formula
A = water usage rate of old equipment
= 55 gpm
B = water usage rate of new equipment = 30 gpm
C = average time equipment runs per day = 8hrs x 60
min/hr = 480 min
D = number of days per year equipment runs = 250 days
E = number of gallons per ccf = 748
|
Annual ccf decrease = |
(A-B) x (C) x (D) |
| |
(E) |
| |
|
|
= |
(55-30) x 480 x 250 |
| |
748 |
| |
|
|
= |
4,011 |
WET Rebate = $4 per ccf/yr
$4 x 4011 = $16,044 = total project rebate for Company X