D3: Sediment Reuse to Support Restoration Projects
This project reuses local sediment removed through Valley Water’s Stream Maintenance Program, capital projects and other local sources to create and restore tidal marsh, riparian or wetland habitats. Sediment may be reused to support the South Bay Salt Pond Restoration project or other environmental enhancement and restoration projects. Valley Water removes sediment from streams to maintain their capacity to carry floodwaters. To secure environmentally appropriate reuse sites, partnership agreements may be required. This project also funds site improvements necessary to facilitate sediment delivery to the reuse sites.
Beneficial reuse of sediment has become a key component in tidal marsh, riparian or wetland restoration around the bay and throughout the county. As sea levels rise, natural sedimentation and vegetation rates cannot keep up and tidal zones are in danger of being submerged, erasing environmental gains from restoration work. By delivering clean sediment from local creeks that would have naturally flowed into the San Francisco or Monterey Bays, this project accelerates natural marsh-building processes and helps to keep up with sea-level rise. Activities necessary for sediment reuse may include testing, transport, cover material, and site improvements required for access.
Upon completing beneficial reuse efforts with the South Bay Salt Pond Restoration Project at Pond A8, Valley Water explored and identified the Pond A4 Resilient Habitat Restoration Project (Pond A4 Project) along the southern shoreline in Sunnyvale as a new location for sediment reuse. The Pond A4 Project, a Valley Water multi-benefit project that the Valley Water Board of Directors approved in April 2023, is designed to create shallow water habitat for shorebirds and promote flood resilience by beneficially reusing material harvested from local creeks to construct a habitat bench along the southern perimeter of Pond A4. This constructed habitat bench will also provide a great foundation for a potential upland transition zone if and when Pond A4 is restored to tidal action. The site is expected to be ready to receive sediment in FY27.
For more information on the Pond A4 Project, visit https://www.valleywater.org/project-updates/pond-a4-resilient-habitat-restoration-project.
In the past, because of the higher standards required to meet criteria under the U.S. Fish and Wildlife Service (USFWS) Quality Assurance Project Plan (QAPP), Valley Water was unable to find enough soil that met the foundation criteria, and even less for cover, thus limiting Valley Water’s ability to deposit the soil at Pond A8. SBSPRP, USFWS, and Valley Water are working with the San Francisco Regional Water Quality Control Board to modify the criteria for reuse material. As part of that effort, Valley Water continued to test the sediment removed to ensure consistent sediment quality data was available. In FY26, Valley Water’s consultant initiated an analysis of wind-wave erosion potential for the habitat bench to be constructed at Pond A4. This work is intended to support recommendations for a reduced thickness of wetland surface material placement at Pond A4. Because Stream Maintenance Program (SMP) sediment rarely meets the criteria for cover material, reducing the required cover thickness could increase the beneficial reuse of SMP sediment that qualifies as foundation material. Under the Pond A4 project-specific QAPP, the current requirement is to place three (3) feet of wetland surface material over any wetland foundation-quality material.
The wind-wave erosion analysis, along with a review of relevant scientific literature, is expected to be completed in FY27. Based on the findings, Valley Water hopes to support a reduction in the required cover thickness from three (3) feet to approximately two (2) feet.
August 2026