Valley Water is hosting public meetings on the Coyote Creek Flood Protection Project. Staff will be providing an update on the project’s flood protection measures designed to reduce the risk of flooding from an event equivalent to the February 2017 storm event.
The project information that will be shared will include details about the flood protection measures that will be built along Coyote Creek and at Kelley, Rocksprings, Selma Olinder, Watson, and William Street Parks. Phase 2 of the Coyote Creek Flood Protection Project is currently in the design phase and construction is anticipated to start in summer of 2025. A second meeting is being held on April 18 at 6:00 p.m. via Zoom only. Use the Zoom details below to participate.
Roosevelt Community Center
Multipurpose Room
901 E. Santa Clara Street
San José, CA 95116
This is a hybrid meeting offered in-person and remotely via the zoom information below.
https://valleywater.zoom.us/j/88581695076
Dial in: (669) 444-9171
Webinar ID: 885 8169 5076
Note: The use of Zoom does not require an account. Spanish and Vietnamese interpreters will be available.
Please visit https://www.valleywater.org/project-updates/creek-river-projects/E1-coyote-creek-flood-protection to view project information or download project maps