About This Project

This project helps restore and maintain healthy steelhead trout populations by improving fish passage and habitat. Possible work sites include Alamitos Creek at Lake Almaden and Ogier Ponds in the Coyote watershed, where man-made creek alterations disrupt fish migration. The project also includes studies of steelhead streams throughout the county to determine where improvements are needed to support spawning, rearing and migration. Funding also pays for the development of a program to use large woody debris to create fish habitat.

 

*This project was voter approved as part of the Safe, Clean Water and Natural Flood Protection Program.

Almaden Lake
Datapoints
Status
Adjusted (schedule adjustment)
Location
Countywide
Schedule
Start FY 2014 / Finish FY 2019
Funding
Safe, Clean Water Fund ($29.5 million)
News and UpdatesNews and Updates
Reports and DocumentsReports and Documents
Environmental and Community BenefitsEnvironmental and Community Benefits
History and BackgroundHistory and Background
News & Updates

Key Performance Indicators for the Safe, Clean Water Program 

KPI #1: Complete planning and design for 2 creek/lake separations.

  • Site 1: Almaden Lake - Public review of the draft EIR for the Almaden Lake Project is expected by late Spring 2018. 

  • Site 2: Ogier Ponds - The final feasibility report for the Ogier Ponds Project is to be completed by early 2018. 

KPI #2: Construct 1 creek/lake separation project in partnership with local agencies. 

  • Currently 2 projects are in the planning phase and 1 will receive construction funding from the Safe, Clean Water Program. 

KPI #3: Use $6 million for fish passage improvements. 

  • The District completed 90% design for the Bolsa Road Fish Passage Project. 

  • The City of San José has completed a feasibility study related to the removal of the Singleton Road fish passage barrier. The District is working on a partnership agreement with the city to provide support for City's effort to remove the Singleton Road Bridge and associated channel restoration. 

  • The Evelyn Bridge Fish Passage within Stevens Creek completed construction on November 21, 2015.

KPI #4: Conduct study of all major steelhead streams in the county to identify priority locations for installation of large wood debris and gravel as appropriate. 

  • Field survey was conducted on preliminary 40 sites on 8 different creeks. Based on field findings, 20 of these will be recommended for further findings, 20 of these will be recommended for further analysis. 

KPI #5: Install large woody debris and/or gravel at a minimum of 5 sites (1 per each 5 major watersheds). 

  • In FY16, the District completed construction of 1 instream complexity feature for steelhead in Stevens Creek at Clearcreek Court (Lower Peninsula Watershed).

 

Updated January 2018 

For more information:

Creek/Lake Separations

Fish Passage Improvements

Large Woody Debris

 

Reports & Documents

No current documents.

 

 

Environmental & Community Benefits

 Key Performance Indicators

  1. Complete planning and design for 2 creek/lake separations.

  2. Construct 1 creek/lake separation project in partnership with local agencies.

  3. Use $6 million for fish passage improvements.

  4. Conduct study of all major steelhead streams in the county to identify priority locations for installation of large woody debris and gravel as appropriate.

  5. Install large woody debris and/or gravel at a minimum of 5 sites (1 per each of 5 major watersheds).

Benefits

  • Improves spawning and rearing habitat within the Coyote, Guadalupe and other watersheds

  • Improves steelhead trout habitat

  • Helps provide required mitigation for environmental impacts of reservoir and recharge operations and for countywide Stream Maintenance Program

Geographic Area of Benefit

Countywide 

    History & Background

    About the Safe, Clean Water and Natural Flood Protection Program

    In November 2012 the voters of Santa Clara County overwhelmingly approved Measure B, the Safe, Clean Water and Natural Flood Protection Program, as a countywide special parcel tax for 15 years with a sunset date of June 30, 2028. This Program replaced the Clean, Safe Creeks and Natural Flood Protection Plan, which voters approved in November 2000.

    The Safe, Clean Water Program was developed with input from more than 16,000 residents and stakeholders and was created to match the community’s needs and values. The voters of Santa Clara County identified five priorities:

    Priority A: Ensure a Safe, Reliable Water Supply

    Priority B: Reduce Toxins, Hazards and Contaminants in our Waterways

    Priority C: Protect our Water Supply from Earthquakes and Natural Disasters

    Priority D: Restore Wildlife Habitat and Provide Open Space

    Priority E: Provide Flood Protection to Homes, Businesses, Schools and Highways

    Other: Six projects from the Clean, Safe, Creeks Plan have been carried forward into the Safe, Clean Water Program.  

    Each year, the District prepares a report providing a progress update for each of these Program priorities, along with fiscal year accomplishments.

    To ensure transparency and accountability to the voters, the ballot measure also created an Independent Monitoring Committee, appointed by the Santa Clara Valley Water District Board of Directors. The Independent Monitoring Committee annually reviews the Program’s progress to ensure the outcomes are achieved in a cost-efficient manner and reports its findings to the Board.

    In addition, the Program requires three independent audits, the first of which was conducted in FY 2017.